Meaning
Moisture is the water a plastic profile or its resin takes up from the air or from storage. In the resin it disturbs the melt, and in the finished profile it changes length. Aluminum is not affected in this way, so moisture is a plastic subject. Polycarbonate, PMMA and the polyamides are the materials the sources name.Uptake
Polycarbonate takes up little water, but the amount is measurable. SABIC’s LEXAN 135 sheet gives 0.15 % at equilibrium in air at 23 °C (73 °F) and 50 % relative humidity. Fully immersed, it reaches 0.35 % at saturation. Covestro gives 0.12 % and 0.3 % for Makrolon ET3113. Both figures are small, yet SABIC still asks for hours of drying before processing.Read More
In the Melt
Moisture thins the melt. Newey’s process paper links that to surface imperfections and size variation along the run. Hygroscopic materials are therefore dried continuously through a dehumidifying dryer. Polyamides absorb water so quickly that they are fed on a closed loop.Drying
Drying times sit on the resin sheet. SABIC lists 2 to 4 hours at 120 °C (248 °F) for LEXAN 135 before processing. A Teknor Apex guide says rigid PVC pellets typically need no drying. Where drying is still wanted, its figure is 49 °C (120 °F) for 2 to 3 hours. A quote for a polycarbonate profile that omits drying has left out a step.Effect on Length
BWF notes that profiles absorb moisture according to storage and ambient conditions, and that length follows. Faces kept in different conditions can change unevenly and show waves or bulges. BWF’s lengths are defined at 20 °C (68 °F) and 30 % relative humidity. Its storage advice is to keep profiles lying flat, near 20 °C and 50 % humidity. A length measured after damp storage is compared with the drawing only after the profile is back at those conditions.Before the Run
Moisture is one of the supply questions settled before a plastic line starts. Dryers sit beside the extruder, the die, the sizer, the puller and the saw as services every line needs. SABIC also lists a hopper temperature of 40 to 60 °C (104 to 140 °F) for LEXAN 135. Dried powder stays warm on its way to the screw. A run’s opening hour goes on getting such conditions right: dry material, steady water, a hot die and a puller at speed.In the Quote
Drying is the line most often missing from a quotation for a polycarbonate profile. Its 2 to 4 hours at 120 °C (248 °F) are real line time and energy. A quote that names the resin grade also names the drying step that grade requires.In Storage
Moisture keeps acting after the profile leaves the line. A profile stored at a humidity other than the agreed reference drifts in length. No saw table allows for that drift. Faces that see different conditions, such as one side against a wall, can change unevenly. Flat storage at stable temperature and humidity keeps the length predictable.In Inspection
A receiving check on plastic lengths follows the reference conditions. The inspection plan states the temperature of measurement, and the profile is conditioned before it is measured. Where a lot has been stored damp, the conditioning time goes into the plan. Without that step, a correct profile can be rejected and a wrong one accepted.Hygroscopic Grades
The sources treat some materials as far more sensitive than others. Newey singles out the polyamides, which absorb water so quickly that they are fed on a closed loop from the dryer. Polycarbonate needs drying but takes up little water at equilibrium. Rigid PVC pellets usually need none. The resin sheet for each grade says which case applies.