Meaning
Inspection is the measuring and checking that shows an extruded profile meets its drawing, material standard and agreed surface before acceptance. It runs at three points: the first profile from a new die, the run itself and the lot as received. Each point has its own sample, method and record. A profile that passes one point has not yet passed the others.First Profile
A new die is proved before production is scheduled. Hydro checks the first profiles and their dimensions against the agreed tolerances before the full run starts. One extruder tests the die to confirm the extrusion matches the print, and another sends samples for the customer’s approval. BWF can create a first article inspection report on request, based on its adjustment drawing. Approved samples are archived as the reference for every later run. The buyer also learns which bar of the trial carries the dimensional report, and who signs it.Read More
Along the Run
Alliance measures diameters inside and out, length and flatness on aluminum parts before they are packed. It also checks composition on a sample cut from the billet and keeps it for audits. Variation gathers at the front and the butt end of each push. A piece from mid-length shows steady state, and a piece from an end shows the worst case. Plastic lines may use laser or ultrasonic gauges that adjust the extruder or haul-off. Lines without them rely on manual gauging at intervals.Plastic Routine
BWF cuts a 100 mm (3.94 in) sample for each test and documents nominal drawing dimensions. A 1,000 mm (39.4 in) test piece from both the first and the last hour of production is measured and kept. Straightness runs on a measuring table in both X and Y. Where a gauge exists, the profile is also tried in the customer’s installation gauge. That functional test often decides acceptance more than the series on the drawing.Receiving Check
A receiving inspection follows from what the tables assume. Lengths are measured at the drawing’s reference temperature, 20 °C (68 °F) in BWF’s case, after the profile has reached it. A table or fixture is used where the tolerance allows it, and a tape only where the table says so. End angle is checked at a stop where it matters, though BWF tests no angle past 4,500 mm (177.2 in). The cut face is judged against the cut quality the order named.Surface and Color
Visible plastic surfaces are checked by eye under set conditions. BWF views the face from about 1 m (3.3 ft), with and without light, spending 10 seconds on each meter. Inclusions are counted against a template per 1 kg (2.2 lb) of profile. Color is released against a customer-approved strip at a deviation of ΔE 3 or less.Certificate Review
For aluminum, inspection includes the mill certificate. The alloy and temper on it match the order line character for character. Measured tensile and yield exceed the minimums for the thickness band, and elongation meets its row. Chemistry falls inside the alloy limits, and the specification is named with its edition. An inspection plan written to EN 755-2 and a certificate written to North American limits can disagree without either being wrong. A result well over the minimum is no fault either, because each row is a floor for single tests.Counting the Result
Results are counted in the unit the run is planned in. For aluminum that is pieces and kilograms, and for plastic it is meters. One overall equipment effectiveness (OEE) guide measures the quality loss of pipe and profile lines by length, and puts the scrap on a scale. Before a plastic run, the buyer agrees which dimensions are measured, at what interval and with what instrument. The University of Illinois thesis allows about 6 % of aluminum pieces as non-conforming in its planning model.Recording the Check
A dimension reading is only useful with its conditions. The record names the gauge or tool and the temperature at which the reading was taken. It also states the temper and finish, since both are set after the press. A sample from the first approved lot is kept as the reference for later ones.