Meaning
The drawing is the dimensioned document that defines an extruded profile: section, length, material, temper, governing standards and each dimension’s limit. Every size, form or surface it leaves open falls to the general tables of the standard it cites. The extruder works to it, and the certificate and the first samples are read against it. A supplier who accepts it is bound by what it states, and by the general tables for everything else.Standard and Edition
A standard cited without its year leaves the edition open. ANSI H35.2 is revised, and a 2025 interpretation letter from the Aluminum Association refers to the 2017 edition and to a possible 2024 one. DIN 16941:2012-11 replaced the 1986 edition, so the year belongs in the note. ASTM B221 gives no metric equivalents, and its metric companion is B221M. Millimeters and MPa on the drawing point to B221M. A drawing that mixes units states which document governs.Read More
Tolerance Class
ANSI H35.2 prints a standard and a precision column for every cross-section dimension. A note that says only “per ANSI H35.2” leaves the class unnamed, and the standard column then governs. An untoleranced 100 mm (3.94 in) width reads at ±0.61 mm (0.024 in). A buyer who needs ±0.41 mm (0.016 in) writes precision against that dimension. On plastic profiles, BWF’s own default where nothing is written is DIN 16941 series 2A and 2B.Form and Orientation
A form limit needs its basis written beside the number. Straightness is a value with its reference length, as in BWF’s example of ±1.5 mm (0.059 in) on 1,000 mm (39.4 in). Twist is stated in degrees, or as a lift at a named face width. Flatness names the surface it applies to and whether the section is solid or hollow. The Aluminum Association applies its straightness limit in every orientation of the piece. The drawing therefore names the fixture or position in which the part is checked. Where a geometric tolerance and a table limit sit on the same drawing, the note says which one governs.Material Line
The material line is what the certificate is matched against, character for character. For aluminum it carries alloy and temper in ANSI H35.1 form, such as 6061-T6 or 6082-T6511. It also names the thickest wall, since the property row and the elongation floor change with the band. A stress-relieved temper is written in full where parts are machined or asymmetrical. Pressure service sends a tube to ASTM B210 or B241, and the drawing says so. For a clear plastic profile, the grade line is joined by the surface class and the color reference.Machining Datums
A drawing that combines extrusion and machining says which dimensions come from which step. Machined features are referenced from clearly defined datums, kept off cosmetic or visible faces. Each tapped hole names cut or formed thread, and each cut end and hole edge states what burr is allowed. The length line says whether the press saw or a second, precision cut sets the length. Where these are missing, each lot becomes a small experiment.Adjustment Drawing
Plastic profile makers often redraw the customer’s drawing before the tool is final. BWF starts with an adjustment drawing and expects approval within 2 working days. The tool is reworked until the section fits, and approved samples are archived as the reference. The production drawing is then revised to match those samples. BWF asks for its approval at least 15 working days ahead of the production start. Where it differs from the general tolerances, the production drawing wins.Revision After Trial
The first die rarely produces the final drawing on its first push. Hydro describes die correction as iterative tuning from trial extrusion data, sometimes repeated after production runs for complex or critical profiles. One extruder tests the die against the print before production, and another sends samples for approval. A lead time quoted for a new die is best asked as a date counted from approved drawings. The drawing revision that follows a trial is the one later lots are measured against.